References Power, Stones / Soils / Glass, Steel / Iron / Other Metals

ACTech GmbH

  • Elaboration of the conception, cooperation within elaboration of the approval part of the project of the erection and setting in operation of some facility for thermal cleaning of exhaust gases, cooperation within elaboration of tender documentation and awarding of the contract as well as cooperation within the erection supervision and commissioning works
  • Elaboration of the housing project purposed to the prospective development of the company and extention of the production capacities
  • Elaboration of the approval part of the project of expansion of the process flows production capacities according to the Local Building Norms and Regulations, including the environmental safety report concerning to the industrial emissions

Halsbruecker Strasse 51
09599 Freiberg
actech 02 1509

Alloyed Steel Production Works of Schmees GmbH

  • elaboration of the technological conception for different modernization procedures
  • Elaboration of the approval project according to the Federal Environment Protection Act (BImSchG), including the expert inspection of measures to provide the air pollution control (calculation of distribution of air pollutions)
  • Elaboration of the expectancy statements to the noise distribution and the report on the noise isolation, including the cooperation within the elaboration of the conception of procedures to provide the noise reduction
  • Elaboration of the construction permission applications
  • Elaboration of the procedure complex to provide the fire safety of the facility


The plants of this enterprise have following locations:

Basteistrasse 60
01796 Pirna Rudolf- Diesel- Weg 6-8
40750 Langenfeld
edelstahlwerke schmees gmbh 1321

ALUFIN GmbH Tabularoxid

  • Elaboration of the application on approvement of the project of some facility to combust the refractory materials containing the base body of aluminium oxide (including the combustion, grinding and fractionation processes) according to the Federal Environment Protection Act (BImSchG), expert examination of the facility within calculation of emissions and distribution of dust and industrial noise, elaboration of the construction permit application, elaboration of the fire safety conception
  • elaboration of the current turnover documentation
  • Elaboration of the escape route maps
  • Elaboration of the fire suppression plans
  • Elaboration of the report on ecologically significant emissions of the facility

Strasse der Einheit 18
06179 Teutschenthal
alufin gmbh tabularoxid 1806

B.U.S. Zinc Recycling Freiberg GmbH

(New name: Befesa Zinc Freiberg Limited, Liability Limited Partnership)

  • Elaboration of the approval part of the project of erection of new furnace and isolating shielding box for the raw material storage according to the Federal Environment Protection Act, inclusively the systemising of the fully set of the plant documentation (for each department of the plant)
  • expert evaluation of the industrial noise and pollutant emissions and distribution (including the calculation of the height of chimneys), implementation of the Act of Inspection of Ecological Compatibility (UVPG)

Frauensteiner Strasse 81
09599 Freiberg
bus zinkrecycling freiberg gmbh 1810

Foundry and Glass forming Works of Radeberg GmbH

  • elaboration of the technological and construction parts of the project of the casting cleaning, moulding core and casting pattern making departments
  • Elaboration of the approval project according to the Federal Environment Protection Act (BImSchG), including the elaboration of the procedure complex to provide the fire and explosion safety of the facility, noise reduction, as well as the storing and handling conception for water contaminating substances
  • Elaboration of the turnover and tender documentation, erection supervision and commissioning works, providing with registration documentation, elaboration of the emission report

Heinrich- Glaeser- Strasse 1
01454 Radeberg
giesserei und glasformenbau radeberg gmbh 1843

Juergens-Foundry Works GmbH & Co. KG

  • Elaboration of the approval part of the project of some logistics centre which is concerned to be a supplementary part of some foundry works, according to the Federal Environment Protection Act (BImSchG), inclusively the construction permission application, fire safety conception and the expert evaluation of the production noise emissions
  • Elaboration of the approval part of the project of expansion of the capacities and operating time and the constructive expansion of the facility, as well
  • Consulting services within the solvent handling

Loensstrasse 15
48282 Emsdetten
juergens 1584

Maerker Kalk GmbH

Oskar- Maerker- Strasse 24
86655 Harburg

Cooperation within elaboration of the approval part of the project documentation for erection of the storage facility for liquid substituted burnables (the conception, approval part of the project documentation, hazard operability report according to the Accident Precaution Instructions, elaboration of the tender documentation, installation supervision and provision of the project with the necessary documentation)


Weiherstrasse 8
89134 Blaustein

Elaboration of the approval part of the project documentation for technological solutions within the storing and handling of the liquid substituted burnables
maerker gmbh 1878

Ortrander Metal Works GmbH

  • Elaboration of the approval part of the project documentation according to the Federal Environment Protection Act (BImSchG) concerning to the different construction stages (erection and installation of new facilities: castings finishing department, melting shop, preparation of moulding sand mixture, moulding lines, grinding department, finished-product output department)
  • Expert examination within calculation of the height of chimneys, calculation of the pollutant flow emissions, calculation of the distribution area of air pollutants, preliminary estimation of distribution of the industrial noise, elaboration of the fire and explosion safety conception, estimation of the operating safety of the facility

Koenigsbruecker Strasse 10-12
01990 Ortrand
ortrander eisenhuette gmbh 1888

Saxony’s Metal Works of Freiberg GmbH

  • Elaboration of the documentation and registering of the inventory coast estimate
  • Updating of the construction and technological inventory
  • Elaboration of the escape route maps
  • Elaboration of the fire suppression plans

Zuger Strasse 13
09599 Freiberg
saechsisches metallwerk freiberg gmbh 1362

TD – Air Condition Compressor Works of Germany GmbH

  • Elaboration of the approval documentation for the project of erection of some new plant according to the Federal Environment Protection Act (BImSchG), inclusively any necessary expert statements
  • Elaboration of the emission report, application for Emissions Register (PRTR) and undertaking of the obligations of the Ecological Pollution Distribution Control Inspector

Weisser Strasse 6
02994 Bernsdorf
tddk 1921